Skip to Search

 
#

Flash version

Construction photographs of the new Library West - April  2005
Finished ceiling preview.
Finished ceiling preview.
Second floor lobby.
Second floor lobby.
Roof decking new section.
Roof decking new section.
Southeast window replacement.
Southeast window replacement.
Waterproofing and brick installation east end new building.
Waterproofing and brick installation east end new building.
First floor curtain wall south side.
First floor curtain wall south side.
Third floor stacks in new building.
Third floor stacks in new building.
Third floor reference desk area.
Third floor reference desk area.
First floor Facilities Department area
First floor Facilities Department area.
Loading dock construction
Loading dock construction.
Built up roof application.
Built up roof application.
Roofing installation on south side of new building.
Roofing installation on south side of new building.
Sheetrock installation.
Sheetrock installation.
Sheetrock being lifted to fourth floor.
Sheetrock being lifted to fourth floor.
Sixth floor graduate studies.
Sixth floor graduate studies.
Bookdrops from the inside on the east end of building.
Bookdrops from the inside on the east end of building.
New brickwork on northeast facade.
New brickwork on northeast facade.
North side of library facing University Avenue.
North side of library facing University Avenue.
New exposed ductwork hangers.
New exposed ductwork hangers.
Plywood and waterproofing application on sloped roof.
Plywood and waterproofing application on sloped roof.
New framing for rollup security gate at escalator.
New framing for rollup security gate at escalator.
Stairwell towers in new library.
Stairwell towers in new library.
   
University of Florida Home Page